EDR was commissioned to deliver the replacement of the Halswell Bowling Green, providing a high-quality, durable and level playing surface for the local community. The project required precise civil construction and drainage works, ensuring the finished green met both functional and aesthetic standards.
The main components of the project included:
Through careful planning and expert execution, EDR delivered a high-performance bowling green built to last. Every stage, from excavation to final base construction, was completed with precision, resulting in a safe, level and visually appealing surface for players. This project highlights EDR’s ability to manage detailed, technically challenging civil works while delivering exceptional results for the community.