Halswell Bowling Green Replacement

EDR was commissioned to deliver the replacement of the Halswell Bowling Green, providing a high-quality, durable and level playing surface for the local community. The project required precise civil construction and drainage works, ensuring the finished green met both functional and aesthetic standards.

Scope of works

The main components of the project included:

  • Preliminary & General - Site establishment, survey set-out, and implementation of traffic management
  • Excavation & Backfill - Removal and off-site disposal of the existing grass surface to 350mm below datum height
  • Bank Installation - Construction of the outer retaining wall with 150mm x 50mm timber capping, finished to align with surrounding paths
  • Drainage - Installation of 65mm agricultural drains and 100mm PVC collector lines to ensure effective water management
  • Inner Plinth Boards - Construction of a 150mm x 50mm inner plinth board, positioned 30mm inside the retaining wall as per design plans
  • Base Construction - Supply and placement of base aggregate, rolled and laser-leveled to a precise tolerance of 5mm below the inner timber plinth board

Project Outcome

Through careful planning and expert execution, EDR delivered a high-performance bowling green built to last. Every stage, from excavation to final base construction, was completed with precision, resulting in a safe, level and visually appealing surface for players. This project highlights EDR’s ability to manage detailed, technically challenging civil works while delivering exceptional results for the community.

Client

Berry Bowling Systems PTY LTD

Key EDR Staff

Harri Maguire, Tyrone Anderson

Contract period

August 2022

Completed Contract period

9 September 2022

Non-conformance at time of practical completion

Nil